Premium PE Foam Underlayment (#4655)

Sold in 100 sq. ft. rolls. The moisture barrier film and tape strip combine to lock out moisture and allow for quick and easy installation Provides cushioned comfort under laminate […]

List Price: $59.99
Price: $24.99
You Save: $35 (58%)

Great news! This product is available.

Buy soon. Supply is limited!

Atlanta, GA

near near Spaghetti Junction

Available now

Great news! This product or a similar one is available.

Get Directions

Or make a design appointment

Kennesaw, GA

near Kennesaw State University

Available now

Great news! This product or a similar one is available.

Get Directions

Or make a design appointment

Roswell, GA

near Roswell, GA

Unavailable

Sorry, this product isn't currently available.

Get Directions

Or make a design appointment


Stay up-to-date on price decreases, sales and new inventory!

Don't worry. We never share or sell your information. Period.


Product Description

  • Sold in 100 sq. ft. rolls.
  • The moisture barrier film and tape strip combine to lock out moisture and allow for quick and easy installation
  • Provides cushioned comfort under laminate and floating wood floors
  • Eliminates minor subfloor imperfections
  • Suitable for use with radiant heat flooring systems
  • 100% recyclable, environmentally friendly
  • Naturally resistant to mold and mildew
  • Non allergenic and odorless

APPROVED SUBSTRATES

  • Dry, completely cured concrete (at least 14 days old with HVAC operating)
  • 3/4″ interior plywood or OSB flooring
  • Waterproofing and crack-isolation membranes
  • Cement backer units

FLOOR PREPARATION

  • Subfloor should be clean and dry
  • In geographic areas where concrete subfloors are subject to excessive moisture, a calcium chloride moisture test is required. Vapor emission readings in excess of 3 lbs. per 1,000 square feet in 24 hrs will require additional protection such as concrete sealant or polyethylene sheeting.

QUICK AND EASY INSTALLATION

  • Requires no additional seaming tape, cuts with a knife
  • Roll out underlayment with tape strip next to wall. Roll out next row in same manner butting underlayment close to first row ( do not overlap ) and covering the moisture barrier film. Remove the tape strip and secure the overlapping moisture barrier film.

Install flooring according to the manufacturer’s installation instructions
*NOT for glue down installations


Don't miss out on sales!

100% secure. We never share or sell your information.